top of page

CAPSTONE PROJECT

This capstone project involved the comprehensive design of a site-specific fitness center and canoe club with a rooftop café on a waterfront site in Bay Shore, New York. The project required integrating architectural design with zoning, code compliance, FAR analysis, septic system sizing, stormwater management, and sustainable site strategies. Through precedent research, site analysis, programming, schematic design, and full site and construction drawing sets, the project emphasized environmentally responsive design, public recreation, and strong connections to the surrounding landscape while meeting New York State Building Code and Town of Islip regulations.

Screenshot 2025-12-17 at 8.41.40 PM.png

PRECEDENT RESEARCH

Screenshot 2025-12-17 at 8.46.25 PM.png

SITE ANALYSIS, PROGRAM, AND BASIC CODE REVIEW

Screenshot 2025-12-17 at 8.47.49 PM.png

THREE SITE-SPECIFIC CONCEPTS

Screenshot 2025-12-17 at 8.49.20 PM.png

FINAL DRAWINGS

Screenshot 2025-12-17 at 8.51.04 PM.png
Screenshot 2025-12-17 at 8.51.56 PM.png
bottom of page